文章摘要
Design Optimization of Utility System of Angren Rubber Factory
Received:October 15, 2020  Revised:October 15, 2020
DOI:10.12136/j.issn.1000-890X.2021.05.0374
Key Words: rubber factory;utility system;boiler room;air pressure station;power station;water pumping station;refrigeration station;transformer and distribution substation
Author NameAffiliationE-mail
PEI Hongbing* Beijing Rubber Industry Research Design Institute Co.Ltd 769252800@qq.com 
AI Yongan Beijing Rubber Industry Research Design Institute Co.Ltd  
YAN Xiaoxing Beijing Rubber Industry Research Design Institute Co.Ltd  
ZHANG Ke Beijing Rubber Industry Research Design Institute Co.Ltd  
Hits: 858
Download times: 396
Abstract:
      Uzbekistan Angren Rubber Factory construction is a Belt and Road Initiative project. This paper introduced the design optimization of the utility system of this factory. In order to further control costs,facilitate implementation,and make equipment operation and maintenance more convenient,some optimization schemes were put forward,such as addition of water seals to the overflow pipe of deaerator in the boiler room,taking partition use of condensation tanks in the boiler room,adding a heat exchanger at the inlet of hot vacuum tank in the power station,using of the existing pumps of the refrigeration system as the backup for each other with the same function,adding supplementary water pipelines to the water reuse pool in the sewage treatment,and moving the area A transformer and distribution substation close to the power load center and the main substation. These optimization schemes were proved to be effective in practice,and had certain reference significance for the design of utility system of similar project